Air-Intake Steel Substructure Welding and Coating Inspection — Slovakia
PSPP provided independent inspection services for fabricated steel substructures forming part of an industrial air-intake system for a European power-generation project. The assignment included welding inspection, NDT witnessing, dimensional verification, coating inspection and quality-documentation review at a manufacturing facility in Slovakia.

- 100%
- Available welds visually inspected during the intermediate stage
- 20%
- Selected fillet, corner and butt welds included in penetrant-testing scope
- 12
- Structural beams prepared in the first inspected batch
- 93
- Dry-film-thickness readings recorded at a selected structural position
The Challenge
The fabricated steel components were required to meet demanding welding-quality, dimensional and protective-coating requirements before final acceptance. The project involved multiple production stages, extensive welded joints, corrective repairs and progressive inspection of partially completed structural batches.
Scope & Approach
PSPP carried out intermediate and progressive final inspections of structural-steel components manufactured for an industrial air-intake system. The inspection activities included review of fabrication drawings, welding instructions, Welding Procedure Specifications, material certificates, welder qualifications and relevant quality records. Visual inspection was performed on all available welds to assess weld profile, geometry, surface condition and visible imperfections against the applicable drawings and acceptance requirements. Penetrant testing was witnessed on selected fillet, corner and butt welds, including lifting-lug welds, in accordance with the approved Inspection and Test Plan. PSPP also performed spot dimensional checks against approved drawings and reviewed the fabrication condition of the first prepared structural batch. Protective-coating inspection included verification of measurement equipment, visual assessment of coated surfaces and dry-film-thickness measurements at selected locations.
The Outcome
The inspected welds were found acceptable following completion and verification of the required corrective actions. Dimensional spot checks showed no identified deviations, and the reviewed coating-thickness measurements were within the applicable project limits. Remaining activities associated with ongoing production were documented for verification during subsequent inspection stages.
Codes & Standards
Gallery




Related work
More case studies

Industrial UPS Factory Acceptance Testing — Switzerland
PSPP provided independent Factory Acceptance Test witnessing and final inspection services for four industrial uninterruptible power supply units manufactured for a major energy infrastructure project. The four-day assignment was completed at a specialist power-systems manufacturing facility in Switzerland.

Gas Turbine Radial Clearance Inspection — Italy
PSPP provided independent inspection support for the final radial clearance verification of a large industrial gas turbine at a manufacturing facility in Italy. The assignment covered both compressor and turbine blade clearance measurements prior to preparation of the unit for shipment.

Transformer Tank Dimensional and Penetrant Inspection — Italy
PSPP provided independent inspection support for the dimensional verification and liquid penetrant examination of fabricated transformer tank and cover components at a manufacturing facility in Italy.