Transformer Tank Dimensional and Penetrant Inspection — Italy
PSPP provided independent inspection support for the dimensional verification and liquid penetrant examination of fabricated transformer tank and cover components at a manufacturing facility in Italy.

- 2
- Components inspected — tank and cover
- 2
- Methods — dimensional and liquid penetrant
- 2
- Dimensional inspection records reviewed
- 2
- Liquid penetrant examination records reviewed
The Challenge
Transformer tank assemblies require accurate dimensional conformity and sound welded surfaces to ensure correct integration of structural supports, flanges, lifting elements, cooling-system connections and associated accessories. The assignment required verification of multiple fabricated features and examination of external weld areas before the components progressed to subsequent manufacturing stages.
Scope & Approach
PSPP carried out independent inspection activities covering the fabricated tank body and its corresponding cover. Dimensional checks were performed against the applicable manufacturing drawings to verify the position, spacing and general dimensions of key components. The inspected features included the tank base, centring elements, lifting points, stiffeners, access-opening frames, radiator connections, heater-support flanges, transport brackets, tank-to-cover interfaces, cable supports, fan supports, lifting plates and other structural attachments. The cover inspection included verification of turret flanges, lifting elements, stiffeners, access openings, cable supports and equipment connections. PSPP also witnessed and reviewed visible liquid penetrant examination of the external surfaces of the tank and cover. The examination included confirmation of surface preparation, penetrant application, removal and developer application, together with review of penetration and development times and the applicable acceptance criteria. Inspection records and component conformity results were reviewed following completion of the activities.
The Outcome
The inspected tank and cover components were reported as dimensionally compliant with the applicable manufacturing requirements. The liquid penetrant examinations were completed with acceptable results in accordance with the specified acceptance level. The components were accepted for progression to the next stage of manufacture.
Codes & Standards
Gallery




Related work
More case studies

Industrial UPS Factory Acceptance Testing — Switzerland
PSPP provided independent Factory Acceptance Test witnessing and final inspection services for four industrial uninterruptible power supply units manufactured for a major energy infrastructure project. The four-day assignment was completed at a specialist power-systems manufacturing facility in Switzerland.

Air-Intake Steel Substructure Welding and Coating Inspection — Slovakia
PSPP provided independent inspection services for fabricated steel substructures forming part of an industrial air-intake system for a European power-generation project. The assignment included welding inspection, NDT witnessing, dimensional verification, coating inspection and quality-documentation review at a manufacturing facility in Slovakia.

Gas Turbine Radial Clearance Inspection — Italy
PSPP provided independent inspection support for the final radial clearance verification of a large industrial gas turbine at a manufacturing facility in Italy. The assignment covered both compressor and turbine blade clearance measurements prior to preparation of the unit for shipment.